
Transport from Esbjerg to the Blyth offshore windpark site of 5 MHI Vestas 8.3 MW turbines (V164-8.3 MW) and the subsequent installation with the wind turbine installation vessel Vole au vent
As part of the project, Jan De Nul performed in-house the engineering and design of the seafastening structures