A 75 km pipeline system consisting of 24" export line and piggy-back 4" MEG line must be installed between the future gas Platform and the existing Rio Cullen facilities.
Capital dredging of a 2 m trench of 11.142 km at shore approach for on-bottom stability of pipeline.
Trench excavation in tidal beach area.
Pull cable laying
1,300 m shore pull of the pipeline with 500 tonnes winch
Backfilling at beach/onshore