Argentina, Vega Pleyade

$
0
0

A 75 km pipeline system consisting of 24" export line and piggy-back 4" MEG line must be installed between the future gas Platform and the existing Rio Cullen facilities.

Capital dredging of a 2 m trench of 11.142 km at shore approach for on-bottom stability of pipeline.

Trench excavation in tidal beach area.

Pull cable laying

1,300 m shore pull of the pipeline with 500 tonnes winch

Backfilling at beach/onshore